Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
Laying hardwood laminate on concrete.
Follow these steps with care to safely complete the installation yourself.
In either case roll the film flat or walk it in stepping on every square foot to ensure adhesion.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Install the plywood after the vapor retarder is in place.
Place the laminate flooring on the concrete slab in the room where it is to be installed.
Laying laminate flooring over concrete can look great and last for many years when installation factors involving the characteristics of concrete are addressed.
These are the challenges.
Puncture bubbles to release trapped air.
When possible always begin layout or installation from the straightest wall generally an outside wall.
Whether you re planning on renting out your home or looking to increase its value using concrete as a base is a great idea.
Leave the flooring in the room for three days before installation.
Laying laminate flooring on concrete laying laminate flooring on concrete floor level in your house or apartment.
This will help to acclimate the flooring to the room temperatures and humidity.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Old basement slabs can crack and buckle in places.
When installing around a doorway slide the plank at least 1 4 inch under the door frame leaving a concealed 3 8 inch expansion gap.
Lay 4 to 6 mil polyethylene film over the slab overlapping the edges 4 to 6.
You will lay the flooring lengthwise to this wall.
Position yourself in a way that allows you to see the board more or less from the side and look for low areas that show up in relation to.
Next with your tapping block or pull bar tap the long side closed first then tap the short side closed.
Snap the chalk line over the top of the concrete or moisture barrier between the marks on opposite walls making a cross in the center of the room.
When you install hardwood floors concrete is one of the best bases to work from there are only a few steps to take.
Lay a 8 to 10 foot piece of lumber on the concrete floor.
Determine your starting wall.
You need to fill any large cracks and be sure that the entire floor is level.
Here is some useful information on the process.