Watch this video to see how easy it is.
Laying hardwood floors on concrete slab.
Cut pieces as you go.
The top layer is made from hardwood.
Before installing any wood floor over concrete you ll need a moisture barrier.
Always have an exit plan when laying out the floor.
You don t want be trapped in a corner and have to walk on the newly installed floors.
Engineered hardwood flooring is made from a high quality plywood.
You usually determine this with a meter that compares the relative humidity of the slab with the ambient humidity.
For your areas with concrete slab engineered wood will be your best bet.
With dry concrete and the right subfloors and vapor retarders solid hardwood floors can be installed on slabs that are either on grade at ground level or above grade above ground level.
It will extend up the wall for about 2 to 3 inches creating a bowl where your wood floor stays dry and protected.
Before you prepare the concrete for hardwood flooring it must be dry.
If the slab is new don t even begin moisture testing until 30 days after pouring it it probably won t be ready to be covered until 60 days after.
Moisture can pose problems for solid hardwood floors below ground level so engineered wood floors made of layers of wood glued together are the best choice there.
Acclimate flooring before installing hardwood floors on a concrete slab the flooring should be acclimated to the installation site.
Lay the floor parallel to longest wall in the room.